[Free] 2017(Nov) EnsurePass Passguide IBM C9010-262 Dumps with VCE and PDF 1-10

EnsurePass
2017 Nov IBM Official New Released C9010-262
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C9010-262.html

IBM Power Systems with POWER8 Enterprise Technical Sales Skills V2

Question No: 1 – (Topic 1)

A customer has a significant investment in open source software for performing in-memory analytics ? This workload is currently deployed an Linux and recent x86 hardware.

What advantage would POWERS provide to this customer?

  1. Up to two times the cores per socket

  2. Up to eight times the ChipKill correction rate

  3. Up to four times the memory bandwidth

  4. Up to six times the PCte bandwidth

Answer: D

Question No: 2 – (Topic 1)

Where should adapter configurations be validated before adding or rearranging adapter

  1. HMC

  2. SSIC

  3. System Planning Tool

  4. e-config

Answer: C

Question No: 3 CORRECT TEXT – (Topic 1)

A customer has older genet aborts of Power servers that they went to manage with their E870 from the same 7042-CR8 HMC running V8R8.2.0.

What is the earliest Power server generation that is supported with this HMC level? A POWER4

  1. POWER7

  2. POWER6

  3. POWER8

Answer: D

Question No: 4 – (Topic 1)

Which is a feature amiable with PowerVM that is not available with PowerKVM?

  1. NFS storage support

  2. Virtualization management through a CLI

  3. Support for RHEL and SLES

  4. HMC Attachment to Power Server

Answer: C

Question No: 5 – (Topic 1)

Which of the following can be moved from a 770 to an EB70 when doing a migration?

  1. EXP30 SSD I/O drawer

  2. Memory DIMMs

  3. PCIe 5802/5877 I/O drawer

  4. EXP24S SFFGen2-bay drawer

Answer: C

Question No: 6 – (Topic 1)

A customer has ordered an E870. The system has been built, but cannot be shipped What would prevent the system from being shipped?

  1. The mandatory pre-install TDA has not been completed

  2. The IBM System Support representative has not completed the pre-install site visit.

  3. A pre-sale TDA discovered correctable issues that have not been corrected.

  4. The opportunity owner has not released it.

Answer: B

Question No: 7 – (Topic 1)

A customer is deploying an E870, which will operate with two client LPARs: each configured with 16

Cores and 48GB memory. Application performance is a critical concern. The LPARs are expected to grow by 25% over the next two years.

The System contains four 10Gb network adapters and four 16Gb FC adapters.

What would be the highest performing and least complex method of presenting storage and networkingg?

  1. Assign two FC and two Network adapters to the Client LPAp. Use Link Aggregation across ports on the Network adapters.

    Use Load Balanced Multjpathing across the ports on the FC adapter.

  2. Assign two FC and two Network adapters to the Client LPARs. Use NIB across ports on the Network adapters.

    Use Load Balanced Multjpathing across the ports on the FC

  3. Use Dual VIO Servers, each with two FC and two Network adapters. Use NIB on the Network adapters in VIOS.

    Use Link Aggregation ,n the Client LPARs. Use NPIV for Storage.

    Use NPIV for Storage

  4. Use Dual VIO Servers, each with two FC and four Network adapters. Use Link Aggregation across ports on the Network adapters.

Use SEA with Failover far Networking. Use NPIV for Storage.

Answer: D

Question No: 8 – (Topic 1)

A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR. Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV.

In addition to assigning the adapter to the VIOS, what else needs to be done?

  1. Reassign the tape to client LPARs as needed.

  2. Complete the vSCSl connectivity and map the tape to client partition

  3. Assign the tape drive to the partitions.

  4. Complete the NP1V connectivity and map the tape to client partition.

Answer: D

Question No: 9 – (Topic 1)

A customer is considering shared processor pools.

Which of the following benefits can they expect to achieve?

  1. Increased core utilization

  2. Greater performance per core

  3. Processor napping

  4. Predictable core performance

Answer: C

Question No: 10 – (Topic 1)

A customer is concerned about a Single Point of Failure (SPOF) because only one System (SCU) is in their proposed E870 solution.

Which response should effectively address the customer#39;s SPOF concern?

  1. A redundant SCU can be added to the order.

  2. Redundant SAN fibre connections are used to connect the SCU to the E870.

  3. Redundant Virtual IO Servers will mitigate this concern

  4. Redundant system Cocks and service processors are in the SCU

Answer: A

100% Free Download!
Download Free Demo:C9010-262 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C9010-262 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE