[Free] 2017(Sep) EnsurePass Dumpsleader IBM C2010-595 V13 Dumps with VCE and PDF 21-30

EnsurePass
2017 Sep IBM Official New Released C2010-595 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-595 V13.html

IBM Maximo Asset Management V7.5 Fundamentals

Question No: 21

Which two actions can be done using the Quick Insert portlet?

  1. Add a New Asset

  2. Modify a reports list

  3. Create a New Work Order

  4. Import data from a spreadsheet

  5. Add additional assignments to the Inbox/Assignments

Answer: B,D

Question No: 22

Which value if updated on a preventive maintenance (PM) record will cause a deletion of an existing forecast?

  1. Changing the description

  2. Adding a new seasonal date

  3. Changing the lead time value

  4. Changing the work order status

Answer: B

Reference:

http://www- 01.ibm.com/support/knowledgecenter/SS9NUN_7.1.1/com.ibm.msc.doc_7.1.1/c_forecast_ pm_logic.html

Question No: 23

When is a flow control action executed?

  1. when a work order is saved through flow control

  2. when the work order is started through a workflow

  3. when the work order is started through a flow control

  4. when the work order is completed through a workflow

Answer: B

Question No: 24

A hard reservation is a request for materials that is defined by what?

  1. A low priority request

  2. A request for assets for a specific job

  3. The need for an item within a specific timeframe

  4. Materials that have been moved to a staging area

Answer: C

Question No: 25

Which application is used to add items to a storeroom?

  1. Inventory

  2. Receiving

  3. Storerooms

  4. Item Master

Answer: D

Question No: 26

When selecting an asset on a work order, which two fields are populated to the work order?

  1. Vendor

  2. Location

  3. Safety Plan

  4. GL Account

  5. Classification

Answer: B,E

Question No: 27

Which statement is true when trying to generate a forecast on a preventive maintenance (PM) record?

  1. The PM must be inactive.

  2. The PM must have a due date.

  3. A forecast must already exist for this PM.

  4. The Forecast field must not be checked for the PM.

Answer: C

Question No: 28

A company has five sites within one organization in their system. They want to activate automatic generation of work orders for three of their sites. Which option can help to achieve this?

  1. Work Orders are automatically generated for each active site.

  2. From the Preventive Maintenance application select Generate Work Orders for all Sites.

  3. Preventive maintenance options must be set up to auto-generate work orders at the site level.

  4. Preventive maintenance options must be set up to auto-generate work orders at the organization level.

Answer: D

Question No: 29

Which two fields must be defined when setting up a consignment item?

  1. Vendor

  2. Finish Date

  3. Invoice type

  4. Item number

  5. Contract Date

Answer: A,C

Question No: 30

How can work order priorities be influenced in the Assignment Manager application?

  1. modify the assignment status to priority

  2. change the work priority and response time

  3. use Set Priority Preferences for a specific assignment

  4. change the response time relative to the work start date

Answer: C

100% Free Download!
Download Free Demo:C2010-595 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-595 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE