IBM Maximo Asset Management V7.5 Implemenation

Question No: 121 – (Topic 2)

A work order has three hours of labor charged but only one hour is reflected in the View Costs table. What is a valid explanation for this?

  1. Only one hour is anapproved labor transaction

  2. Outside labor hours are not reflected in the View Costs table

  3. Two of the hours were worked by an outside contractor so those hours are reflected as a Service

  4. The view actuals date filter is set for 30 days and two of thehours were recorded greater than 30 days ago

Answer: A

Question No: 122 – (Topic 2)

Click the Exhibit button.

Ensurepass 2017 PDF and VCE

The data field titled Reservation Type is used when planning material reservations from the Plans tab of Work Order Tracking. Which statement is true?

  1. An automatic reservation is a request for materials that is not subject to a timeframe.

  2. An automatic reservation defines the processing of the reservation based on the date the materials are required.

  3. An automatic reservation is a request for materials that is defined by the need for an item from a specific vendor.

  4. An automatic reservation takes over the stock item reorder process and automatically generates the purchase requisition.

Answer: B

Question No: 123 – (Topic 2)

Which sequence describes the procedure to report labor by contract/vendor?

  1. Open the Reporting application, select the Labor Reporttab, enter contract/vendor and labor hours

  2. Open the Labor Reporting application, select the Labor Report tab. enter contract/vendor and labor hours

  3. Open the Reporting application, select Enter by Contract/Vendor from the Select Action menu, enter labor information

  4. Open the Labor Reporting application, select Enter by Contract/Vendor from the Select Action menu, enter labor information

Answer: D

Question No: 124 – (Topic 2)

What is the purpose of a connecting line in a workflow process?

  1. To change the status of a node

  2. To branch to a workflow process

  3. To move from one node to another

  4. Toidentify who a workflow assignment will route to

Answer: C

Question No: 125 – (Topic 2)

Whichstatement correctly describes the use of the person group data type in creating a role?

  1. It is used to route a record to members of a person group.

  2. If the person data type is selected then the formation of a role is based on existing person groups.

  3. If the e-mail option is selected for the person group data type then assignments and notifications are sent to all members of the group.

  4. If the broadcast option is selected for the person group data type, then the assignment or notification is sentto either the first available group member based on calendar and shift or to the individual who is the default group assignee.

Answer: A

Question No: 126 – (Topic 2)

Which three options are available to set the reservation type on the Work Order Materialssub-tab? (Choose three.)

  1. SOFT

  2. HARD

  3. URGENT

  4. REQUIRED

  5. RESERVED

  6. AUTOMATIC

Answer: A,B,F

Question No: 127 – (Topic 2)

Which statement is true regarding reversing an invoice?

  1. The original invoice can be replaced by reversing it.

  2. An invoice can be reversed by creating a return receipt.

  3. An invoice can be reversed creating a return transaction.

  4. A three way match invoice can be reversedcreating a return transaction.

Answer: A

Question No: 128 – (Topic 2)

What does the lt;instaii homeVCTG_DE\acsi\bin\iistiu command do?

  1. displays the installed Maximo V7.5 components, from the Deployment Engine view

  2. displays the installed Maximo V7.5 components, from the Maximo System Information view

  3. displays the installed Maximo V7.5 and middleware components, from the Maximo System Information view

  4. displays the installed Maximo V7.5 and middleware installer installed components, from

the Deployment Engine view

Answer: D

Question No: 129 – (Topic 2)

What is the purpose of the Inventory Usage application?

  1. To list all inventory tool items within a storeroom

  2. To list all inventory service items within a storeroom

  3. To track the issue, transfer, and reuse of inventory items within and across sites

  4. To track the issue, transfer, and return of inventory items within and across organizations

Answer: D

Question No: 130 – (Topic 2)

Inwhich application is the default stock category set?

  1. Inventory

  2. Item Master

  3. Organizations

  4. Inventory Usage

Answer: C

100% Free Download!
Download Free Demo:C2010-570 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-570 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE