[Free] 2017(Sep) EnsurePass Testinsides IBM C2010-570 V13 Dumps with VCE and PDF 51-60

EnsurePass
2017 Sep IBM Official New Released C2010-570 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-570 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 51 – (Topic 1)

Where are IBM Maximo Asset Management V7.5 properties changed?

  1. Logging.properties file

  2. Mxserver.properties file

  3. System Properties application

  4. Application Properties application

Answer: C

Question No: 52 – (Topic 1)

A forecast for a preventive maintenance record has been generated. How canthe forecast date be adjusted from the Preventive Maintenance application?

  1. From the Forecast tab, select a forecast row, enter a value in the New Date field, click Save

  2. From the Select Action menu, select Generate Forecast, enter a value in the Forecast Days field, click OK

  3. From the Frequency tab, select the Time Based Frequency tab, enter a value in the Frequency field, click Save

  4. From the Frequency tab, select the Time Based Frequency tab, enter a value in the Extended Date field, click Save

Answer: A

Question No: 53 – (Topic 1)

Which statement is true regarding the master Preventive Maintenance (PM) record?

  1. A master PM record is generated by the Meters application.

  2. A master PM record is generated by the Assets application.

  3. A master PM record generates work orders like any other PM.

  4. Associations between existing PM records and a master PM record can be made.

Answer: D

Question No: 54 – (Topic 1)

When creating a purchase request line by using the Select Spare Parts button, refined search is allowed by specifying at least one of which two data fields? (Choose two.)

  1. Site ID

  2. Description

  3. Item Number

  4. Asset Number

  5. Organization ID

Answer: A,D

Question No: 55 – (Topic 1)

What are three standard reported priority values for a service request in the Service Request application? (Choose three.)

  1. Low

  2. High

  3. Urgent

  4. Normal

  5. Delayed

  6. Planning

Answer: A,B,C

Question No: 56 – (Topic 1)

A work order is generated from a route and each stop on the route has a unique job plan and safety plan. Which option should be selected for: When this Route is Applied to a Work Order,the Route Stops will Become?

  1. Child Work Orders

  2. Work Order Tasks

  3. Sequenced Job Plans

  4. Entries in the Work Order#39;s Multi Asset, Location, and CI Table

Answer: A

Question No: 57 – (Topic 1)

After fully receiving a shipment, it is discovered that the item or tool is damaged and must be sent back. How is it recorded that the good(s) have been returned in the Shipment Receiving application?

  1. Find theshipment receipt, select New Row, enter the quantity, item, and then select SHIPRETURN for the Transaction Type

  2. Find the shipment receipt, select New Row, enter the quantity, item, and then select SHIPDAMAGED for the Transaction Type

  3. Find the shipment receipt, select the button Select Damaged Items, select each item and update the quantity to be returned, click OK

  4. Find the shipment receipt, select the button Select Items for Return, select each item and update the quantity to be returned, click OK

Answer: D

Question No: 58 – (Topic 1)

An asset is created and measurement points are associated. Which IBM Maximo Asset Management V7.5 application sets Upper Limit and Lower Limit Job Plans?

  1. Meters

  2. Assets

  3. Condition Monitoring

  4. Work Order Tracking

Answer: C

Question No: 59 – (Topic 1)

Which option attaches an image to an item master record in the Item Master application?

  1. Clicking on the Image icon

  2. Clicking on the Attachments icon

  3. Select Action gt;Add/Modify Image

  4. Select Action gt; Attachment/Library Folders

Answer: C

Question No: 60 – (Topic 1)

What comprises a failure code?

  1. Failure, affect, fix

  2. Issue, reason, resolution

  3. Problem, cause, remedy

  4. Situation, impact, solution

Answer: C

Explanation: Failure codes are specified on asset recordsand on location records. Failure codes are linked in parent-child relationships to form a failure hierarchy.

-> Failure hierarchiesA failure hierarchy is aset of data on the problems, the causes,

and the remedies for asset failures and for operating location failures.

100% Free Download!
Download Free Demo:C2010-570 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-570 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE