[Free] 2017(Sep) EnsurePass Testinsides IBM C2010-570 V13 Dumps with VCE and PDF 71-80

EnsurePass
2017 Sep IBM Official New Released C2010-570 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-570 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 71 – (Topic 1)

What is a valid report option in the Labor Reporting application for external contractors or internal employees?

  1. Reporting labor by site

  2. Reporting labor by contract

  3. Reporting labor by work order

  4. Reporting labor by organization

Answer: C

Topic 2, Volume B

Question No: 72 – (Topic 2)

Which statement is true regarding job plan editing?

  1. Job plans with a status of DRAFT or PNDREV may be edited.

  2. Job plans can never be edited once they have been revised (revision number gt; 0).

  3. To edit a job plan, use the select action command to Revise Job Plan. This action cancels the initial job plan, creating an editable copy in the REVISED status.

  4. To designate a job plan for a different organization or site, use the select action command to Revise Job Plan and then change the organization or site identifier.

Answer: A

Question No: 73 – (Topic 2)

What is the initial default statuswhen creating a Request for Quotation?

  1. INPRG

  2. DRAFT

  3. WAPPR

  4. INACTIVE

Answer: A

Question No: 74 – (Topic 2)

Which statement is true about a master preventive maintenance (PM) record?

  1. A master PM record does not generate work orders.

  2. Associated PM records cannot be created from master PM records.

  3. A master PM record generates work orders like any other PM records.

  4. Associations between existing PM records and a master PM record cannot be made

Answer: A

Question No: 75 – (Topic 2)

What task must be performed as part of initial data entry?

  1. Create Tool

  2. CreateCraft

  3. Create Order

  4. Create Organization

Answer: D

Question No: 76 – (Topic 2)

Where are documents added to IBM Maximo Asset Management V7.5?

  1. Manage Files Select Action from the application that allows attached documents

  2. Manage Library Select Action from the application that allows attached documents

  3. Manage Folders Select Action from the application that allows attached documents

  4. Manage Documents Select Action from the application that allows attached documents

Answer: B

Question No: 77 – (Topic 2)

Which application is used to add more values in the Work Type list?

  1. Domains

  2. Organizations

  3. WorkOrder Tracking

  4. Database Configuration

Answer: B

Question No: 78 – (Topic 2)

What is the main purpose of the Job Plan Sequence tab in the Preventive Maintenance (PM) application?

  1. To assign a sequential list of PM job plans which allows for schedulingdifferent levels of maintenance work

  2. To schedule a sequence of PM records during specified times of the year including active PM days, weeks, or months

  3. To schedule criteria for sequencing work order generation from PM records in which PMs can be scheduled time-based or meter-based

  4. To generate a group sequence of PM work orders for an asset or location hierarchy which allows for organizing job plans for inspections and large projects

Answer: A

Question No: 79 – (Topic 2)

How is a kit item used?

  1. To group items by classification

  2. To order a set of related commodity codes

  3. To store a group of items for project staging

  4. To maintain and issue a specific list of items

Answer: D

Question No: 80 – (Topic 2)

Where are inventory cost options defined?

  1. Sites application

  2. Inventory application

  3. Item Master application

  4. Organizations application

Answer: D

100% Free Download!
Download Free Demo:C2010-570 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-570 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE