Question No.91

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt#39;s effort requiring that the average cost of an internal critical raw material component be less than or equal to $4,200 in order to stay within budget. Using a sample of 35 first article components, a Mean of the new product upgrade price of $4,060, and a Standard Deviation of

$98 was estimated. In order to increase the Long Term Z value to 4, what is the maximum long term variation in pricing the Belt can accept for his upgraded critical raw material component?

A.

$20

B.

$35

C.

$70

D.

$110

Correct Answer: B

Question No.92

An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reproducibility problem, not a Repeatability problem.

  1. True

  2. False

Correct Answer: B

Question No.93

From the variance F-test shown above, which of these conclusions is/are valid?

image

  1. The variance between the class score distribution is not significantly different

  2. This test applies only to Normal Distributed data at 99 % confidence

  3. The variance between the class score distribution is significantly different

  4. There are not enough data points to make any statistical conclusions

Correct Answer: C

Question No.94

Contingency Tables are used to test for association, or dependency, between two or more classifications.

  1. True

  2. False

Correct Answer: A

Question No.95

Fractional Factorial, and Response Surface Method are types of planned experiments.

  1. Multi-Vari Analysis

  2. Baldridge Channels

  3. One Factor at a Time or OFAT

  4. Factorial Design

Correct Answer: D

Question No.96

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

  1. Review the Visual Factory to assure inventory in excess of desired visible

  2. Improve the lighting to assure adequate visibility

  3. Analyze data from supplier deliveries

  4. Reword the standardized work instructions to use active verbs and not passive phrases

Correct Answer: A

Question No.97

The primary objective in removal of waste is to improve the Order Production Cycle where the time from to the time of receipt of payment is compressed.

  1. Shift start

  2. Product development

  3. Receipt of an order

  4. New fiscal year

Correct Answer: C

Question No.98

Which statement(s) are correct about the DOE Factorial plot output here? (Note:There are 3 correct answers).

image

  1. Two factors were operated at 3 levels each

  2. The highest tool age was achieved with metal hardness at high level while keeping the cutting speed at the low level

  3. The design indicated above is a 32 factorial design

  4. The cutting speed and cutting angle are at the low level for the least tool age achieved

  5. All factors had 2 levels in the experiment

Correct Answer: BCE

Question No.99

A dock worker for a feed supplier was tasked with assuring the proper weight in the feed bags as they left the dock. One of the columns listed the range of weight of the bags included in the studies. This required plotting a Histogram of the weight of the bags. While drawing the Histogram the x-axis contained a certain scale of data. Pick the scale of data that is appropriate for Histograms.

  1. Ordinal Scale Data

  2. Interval Scale Data

  3. Nominal Scale Data

  4. Ration Scale Data

Correct Answer: B

Question No.100

An operator is measuring the distance between two points. Which is most likely to be influenced by the operator?

  1. Precision of the measurement

  2. Accuracy of the measurement

  3. Calibration of the instrument

  4. All of these answers are correct

Correct Answer: D